Award Details
Search Result(s) Details last updated on Saturday, May 31, 2008
S.No. | Location | NIT Number | Classification | Description | Award Date | Name of Contractor | Value of Contract | Details |
---|---|---|---|---|---|---|---|---|
1 | Ramagundam Super Thermal Power | 09/CS/2K7-2K8/NIT-08 | Work Contract | ANNUAL MAINTENANCE OF ST. I, II & III COOLING TOWERS. | 31/05/2008 | BOBBY ERECTORS | 3655252.42 | |
2 | Ramagundam Super Thermal Power | 09/CS/2K7-2K8/NIT-08 | Work Contract | CONTRACT FOR MAINT. OF MILLING SYSTEM IN STAGE I | 19/05/2008 | SRINIVASA GENL ENGG WORKS | 4997550.83 | |
3 | Ramagundam Super Thermal Power | 09/CS/2K7-2K8/NIT-08 | Work Contract | CONTRACT FOR MAINT. OF MILLING SYSTEM IN STAGE II & III | 17/05/2008 | S. THIRUPATHI REDDY | 5926419.54 | |
4 | Ramagundam Super Thermal Power | 09/CS/2K7-2K8/NIT-09 | Work Contract | MAINT. OF LRSB,WALL BLOWER,BURNER,FUEL OIL PUMP & WORKS IN PP & REPAIR/ O/H OF DUCTS,DAMPERS | 14/05/2008 | ADORE CONTRACTORS (P) LTD. | 9041791.26 | |
5 | Ramagundam Super Thermal Power | 09/CS/2K7-2K8/NIT-09 | Work Contract | ANNUAL CONTRACT FOR MAINT. & OVERHAUL WORKS OF BOTTOM ASH & ASH DISPOSAL SYS. OF ST. I, II &III | 29/04/2008 | M/s. V. P. VARGHESE | 8554384.8 | |
6 | Ramagundam Super Thermal Power | 09/CS/2K7-2K8/NIT-08/OT-M-012 | Work Contract | MAINT. WORKS IN FLY ASH SYSTEM OF ST. I, II & III INCLUD. DAETPS AND BRICK PLANT | 16/04/2008 | NOORIE ENGINEERS | 9846473.10 | |
7 | Ramagundam Super Thermal Power | 09/CS/2K7-2K8/NIT-09 | Work Contract | AC FOR MAINT. OF ASH DISPOSAL LINES & ASH POND MGMT. | 16/04/2008 | A B C ENGINEERING WORKS | 7239221.52 | |
8 | Ramagundam Super Thermal Power | 09/CS-O&M/2K7-2K8/NIT-02/OT-M-06 | Work Contract | AMC FOR EHV & HV TRANSFORMERS AND ESP RECTIFORMERS (ST. I,II & III). | 24/12/2007 | M/s. TIRUPATHI ENTERPRISES | 2321334.23 | |
9 | Ramagundam Super Thermal Power | 09/CS-O&M/2K7-2K8/NIT-02/OT-M-05 | Work Contract | CONTRACT FOR MISC. MAINT. WORKS IN ROTATING MACHINES OF STAGE I. | 22/12/2007 | M/s. V. P. VARGHESE | 2957029.10 | |
10 | Ramagundam Super Thermal Power | 09/CS/2K7-2K8/NIT-03/OT-P-03 | Work Contract | Black Topping of Raods in Township at RSTPS. | 13/12/2007 | M/s. P. Ramchander Rao & Co. | 5773500 | |
11 | Ramagundam Super Thermal Power | 09/CS/2K6-2K7/NIT-08 | Work Contract | RLA Studies & Steam Path Audit of 200 MW. Unit # 2 Turbine. | 29/10/2007 | M/s. STEAG Encotec India Pvt. Ltd. | 1990000 | |
12 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-07/OT-M-22 | Work Contract | HP tube repair / replacement in Pass-II in State-I during. | 04/10/2007 | V.P. Varghese | 4931929.84 | |
13 | Ramagundam Super Thermal Power | 09/CS-O&M/2K7-2K8/NIT-01/OT-M-04 | Work Contract | ANNUAL CONTRACT FOR INSULATION WORKS INCLUDING SPRAY INSULATION & REFRACTORY WORKS IN ST.1,2,3. | 28/09/2007 | A B C ENGINEERING WORKS | 5310848 | |
14 | Ramagundam Super Thermal Power | 09/CS/2K6-2K7/NIT-09 | Work Contract | Supply of Screw chiller for Central Air Conditioning System for Community Centre at PTS. | 26/09/2007 | M/s. Carrier Asia Ltd, Hong Kong. | USD 66000 | |
15 | Ramagundam Super Thermal Power | 09/CS/2K6-2K7/NIT-09 | Work Contract | Central Air Conditioning System for Community Centre in PTS | 26/09/2007 | M/s. Comfortline Systems Pvt. Ltd | 6518000 | |
16 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-09/OT-M-33 | Work Contract | ANNUAL CABLE LAYING & MISC. WORKS OF STAGE I, II & III MAIN PLANT,OS,CHP AND C&I AREAS FOR 2007-08. | 25/09/2007 | S. THIRUPATHI REDDY | 3081942.49 | |
17 | Ramagundam Super Thermal Power | 09/CS-O&M/2K7-2K8/NIT-01/OT-M-02 | Work Contract | Picking of stones, boulders & foreign materials from running conveyors. | 21/09/2007 | S.PRINCE HI-TECH PVT. LTD. | 7291400.48 | |
18 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-0/OT-M-31 | Work Contract | OVERHAULING OF TG AUXILIARIES OF ST.1,2,3 UNITS DURING UNIT OVERHAUL/SHUTDOWN/AUX EQPMT IN 07-08. | 06/09/2007 | BROTHERS ENGG. & ERECTORS LTD. | 3993300 | |
19 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-07/OT-M-23 | Work Contract | Replacement of HP Tubes of Pass-II & Shielding Works in ST-II & III Boilers During 2007-08 O/H. | 06/08/2007 | ADORE CONTRACTORS | 6797015.95 | |
20 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-09/OT-M-032 | Work Contract | AMC FOR MAJOR EQUIPMENTS IN CHP & DECANTING OF HFO RAIL TANKERS. | 17/07/2007 | RADHA KRISHNA ENGG.WORKS | 3156638.59 | |
21 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-09/OT-M-30 | Work Contract | AMC FOR CONVEYORS IN STAGE 1, 2 & 3 AUGMENTATION & WAGON TIPPLERS AREA. | 16/07/2007 | NOORIE ENGINEERS | 8450792.28 | |
22 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-08/OT-M-28 | Work Contract | REPAIR / RECLAMATION / FABRICATION WORKS FOR ALL UNITS IN STAGE I, II & III | 12/07/2007 | NOORIE ENGINEERS | 4546819.09 | |
23 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-08/OT-M-28 | Work Contract | REPAIR / RECLAMATION / FABRICATION WORKS FOR ALL UNITS IN STAGE I, II & III. | 12/07/2007 | NOORIE ENGINEERS | 4546819.09 | |
24 | Ramagundam Super Thermal Power | 09/CS/2K6-2K7/NIT-05 | Work Contract | Raising of Ahs Dyke in N1 Pond including divider Bund with pond Ash of RSTPS from RL-194M to 198.50M | 07/07/2007 | M/s. Srilaxmi Engineering Company | 67110281.81 | |
25 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-07/OT-M-20 | Work Contract | MISC. MAINT. WORKS IN OFFSITES AREA AT NTPC, RDM. | 06/07/2007 | RADHA KRISHNA ENGG.WORKS | 3646733.91 | |
26 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-07/OT-M-19 | Work Contract | ERECTION OF QUICK ERECT SCAFFOLDING IN BOILER STAGE-I,II & III DURING 2007-08 OVERHAULS. | 02/07/2007 | PRABHAT ENGINEERING WORK | 2413005.41 | |
27 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-07/OT-M-24 | Work Contract | REPLACEMENT HP TUBES IN PASS-I & II SH/RH/DIV. PANEL&PENTHOUSE &O/H OF BURNERS OF ST.2&3 BOILER | 30/06/2007 | BROTHERS ENGG. & ERECTORS LTD. | 6894675 | |
28 | Ramagundam Super Thermal Power | 09/CS/2K6-2K7/NIT-08:R&M/OT-02 | Work Contract | Steam Path Audit of Turbines of Unit #4 (500 MW) during Overhauls 2007-2008. | 14/06/2007 | M/s. NASL | 800000 | |
29 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-07/OT-M-25 | Work Contract | OVERHAULING OF SECONDARY AIR PREHEATERS OF 500MW UNITS (STAGE - II & III) DURING 2007-08 OVERHAUL | 24/05/2007 | NOORIE ENGINEERS | 4949162.37 | |
30 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-08/OT-M-27 | Work Contract | OVERHAULING OF FANS & AIR PREHEATERS IN STAGE I & PRIMARY PREHEATERS IN STAGE II & III (2007-08) | 21/05/2007 | B.R.TECNICS | 1606846.30 | |
31 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-07/OT-M-18 | Work Contract | OVERHAUL & MISC. WORKS OF RAW WATER PUMPS, STAGE I, II & III CW PUMPS & BALANCED RESERVOIR GATES | 18/05/2007 | SRINIVASA GENL ENGG WORKS | 4106140.65 | |
32 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-07/OT-M-17 | Work Contract | MAINT. JOBS OF C&I SYS. IN ST.1,2 & 3 IN BURNER, FRONT & FUEL FIRING SYS.,DAETP,LWTP & ASH BRICK | 30/04/2007 | R LAXMAIAH | 3875064.18 | |
33 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/OT-M-014 | Work Contract | OVERHAULING OF SECONDARY AIR PREHEATERS OF 500MW UNITS (STAGE - II & III) DURING 2007-08 OVERHAUL | 17/04/2007 | S. THIRUPATHI REDDY | 2093050.91 | |
34 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-05/OT-M-011 | Work Contract | OVERHAULING OF FANS & AIR PREHEATERS IN STAGE I & PRIMARY PREHEATERS IN STAGE II & III (2007-08) | 05/04/2007 | M/s. V. P. VARGHESE | 2845052.27 | |
35 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-05/OT-M-010 | Work Contract | REPLACEMENT OF PF BENDS IN STAGE I, II & III DURING OVERHAULS 2007-08 | 03/04/2007 | NOORIE ENGINEERS | 2456598.87 | |
36 | Ramagundam Super Thermal Power | 09/CS/2006/OT-06 | Work Contract | CONSTRUCTION OF PUMP HOUSE, SUMP, DISCHARGE CHANNEL, RCC CULVERTS & SERVICE ROADS ALONG DOWN STREAM OF N2 MAIN DYKE. | 27/01/2007 | R. SREE RAMA RAO | 11719636.52 | |
37 | Ramagundam Super Thermal Power | 09/CS-O&M/2K6-2K7/NIT-04/OT-M-09 | Work Contract | STEAM PATH AUDIT OF HP,IP,LT TURBINE & RLA STUDY OF CRITICAL POWER CYCLE PIPING FOR UNIT-3 (ST.I) | 09/12/2006 | NTPC-ALSTOM POWER SERVICES PVT. Ltd. | 720000.00 | |
38 | Ramagundam Super Thermal Power | 09/CS/2k6-2k7/NIT-02 | Work Contract | ANNUAL MAINTENANCE JOBS IN TM OF STAGE-I, II & III. | 28/11/2006 | M/S BHARAT ENGG COMPANY | 3854123.01 | |
39 | Ramagundam Super Thermal Power | 09/CS/2k6-2k7/NIT-02 | Work Contract | LONG TERM MEASURES IN N2 STARTER DYKE & FIRST RAISING FLOOD ESCAPE AND DOWN STREAM OF N2 FLOOD ESCAPE. | 17/11/2006 | S. THIRUPATHI REDDY | 4338000.00 | |
40 | Ramagundam Super Thermal Power | 09/CS/2K6-2K7/NIT-03/OT-P-04 | Work Contract | CONSTRUCTION OF COMMUNITY CENTRE IN PERMANENT TOWNSHIP | 16/11/2006 | B.V. RAMANA RAO | 13989273.34 |